The extension to the care home was split into two phases.  Phase 1 produced 9 bedrooms and phase 2 6 bedrooms.  
The project was designed and built by Baxter & King  and it utilised the land already owned by the home.  The phases were constructed two years apart.  The home was in full use throughout this period.